Retrofitting Old Buildings for Smart Grid Compliance: What Contractors Need to Know
31 July 2026 at 09:42
A property manager calls about a 1958 mixed-use building downtown. The utility wants time-of-use metering installed by next quarter, the tenants want their AC to keep running through the switchover, and nobody on the ownership side wants to hear the words βfull rewireβ. This is, more or less, how most smart grid retrofit jobs start. [β¦]